2020 january 15th. The upper terrace is almost finished ;-)
2020 january 15th. The north side mini garden is now prepared for more trees ;-)
2020 january 13th. The final layer of gravel is distributed over the upper terrace
2020 january 13th. Gravel is poured on the upper terrace
2020 january 11th. The base anti-grass layer is set beside the veranda
2020 january 9th. The The north side wall is ready
2020 january 11th. The The north side wall is ready